Transport and Harbours Department logoTransport & Harbours DepartmentIntegrated Operations & Safety Command Centre
← All stellings

Parika Stelling

Region 3, Essequibo River

Operational
Berth use
MV Kimbia alongside
Berth 1, turnaround in progress
Next arrival
MV Kanawan, 15:42
Scheduled arrival
Issues affecting operations
2 open
Open actions
3 in hand

Issues affecting ferry operations

2 open
Berth 2 ramp operating intermittentlyDCK-0031, since 14:42

Hydraulic ramp cycling inconsistently under vehicle load. Vehicle loading is being handled through Berth 1 while engineering attends.

Engineering notified
Heavy vehicle congestion on approach roadDCK-0032, since 15:05

Vehicle queue extends beyond the marshalling area.

Being managed on site

Arrivals and departures

ArrivalMV Kanawan15:42Scheduled arrival
DepartureMV Kanawan16:00Parika → Supenaam

Open actions

Open Actions & Resolution →
  • MV Malali, steering defectIn progress

    Obtain independent engineering assessment before vessel returns to service.

    ACT-0091Owner: Marine SuperintendentDue: 17 August, 16:00
  • MV Kimbia, six-month safety systems inspectionOverdue

    Complete full safety systems inspection and submit certified inspection record.

    ACT-0086Owner: Safety Manager, L. EdwardsDue: 13 August, 17:00
  • Pre-departure procedure compliance, corrective actionEscalated

    Implement corrective action plan with supervisor sign-off on every departure.

    ACT-0089Owner: Terminal Supervisor, ParikaDue: 15 August, 12:00

Recent incidents

DateIncidentVesselStatus
16 Aug, 18:52Steering pump #2 hydraulic pressure loss on approach
INC-0451
MV MalaliUnder investigation
17 Aug, 09:41Fire detection panel zone 4 indicator lamp dim
INC-0448
MV KanawanMonitoring
15 Aug, 16:40Overheight vehicle refused at ramp after ticketing
INC-0447
MV Konawaruk 1899Closed