Out of serviceReturn to Service Not AuthorisedExecutive vessel operating picture. Drill down only where an exception exists.
Safety & compliance
Recorded requirements and whether they have been satisfied
Vessel withdrawn from service, return to service blocked pending independent assessment
- ✕Required operational checks completedNot attempted, vessel out of service
- ✓Required crew confirmed10 / 10 carried, alongside Parika
- ✕Required inspections currentReturn-to-service engineering assessment outstanding (ACT-0091)
- –Manifest reconciledNo voyage scheduled
- ✕No blocking restrictions recordedOut-of-service condition recorded 17 Aug 09:12
- Critical steering defect unresolved, vessel withdrawn from service (MR-0241)
- Independent engineering assessment not yet received, due 17 Aug 16:00 (ACT-0091)
| Requirement | Last completed | Next due / expiry | Status |
|---|---|---|---|
| Pre-departure inspection | 16 Aug 08:58 | On return to service | ⚠ Suspended |
| Six-month safety systems inspection | 30 Apr | 30 Oct | Current |
| Life-saving equipment inspection | 08 Jul | 08 Jan 2027 | Current |
| Vessel certificate | — | 27 Sep | Current |
- Critical steering defect unresolved, vessel withdrawn from serviceACT-0091
- Recurring steering defects under review, 4 in 12 monthsRSK-012
Crew and safety equipment: compliant.
Maintenance & condition
Condition by vessel domain, from maintenance reports, inspections, defect reports and completed repairs
| Domain | Status | Open | Latest significant issue |
|---|---|---|---|
| Propulsion | Warning | 1 | Port engine exhaust temperature deviation |
| Steering | Critical | 1 | Hydraulic pressure loss |
| Electrical | Normal | 0 | — |
| Hull & Structure | Normal | 0 | — |
| Fire & Safety Systems | Normal | 0 | — |
| Navigation & Communications | Normal | 0 | — |
| Pumps & Bilge | Normal | 0 | — |
| Deck & Loading Equipment | Normal | 0 | — |
| Auxiliary Systems | Normal | 0 | — |
- MR-0219 Port engine exhaust temperature deviationMonitoring
Exhaust temperature deviation recorded on two voyages. Injector condition to be assessed during current out-of-service period.
Source: Maintenance report (MR-0219)22 JulResponsible: Marine Engineering
Open issues & actions
Significant current matters for this vessel
- Risk RSK-011: Repeated crew procedure non-complianceEscalated
3 recorded omissions in 30 days across two vessels.
Open RSK-011 → - Risk RSK-014: Recurring steering defects, MV MalaliUnder review
4 steering-related defects reported in 12 months, latest resulted in loss of service.
Open RSK-014 → - Action ACT-0091: MV Malali, steering defectIn progress
Obtain independent engineering assessment before vessel returns to service.
Open ACT-0091 → - Incident INC-0451: Steering pump #2 hydraulic pressure loss on approachUnder investigation
16 Aug, 18:52 · Machinery failure
Open INC-0451 → - Risk RSK-016: Wet-weather slips on passenger stairsUnder review
3 wet-deck slips recorded this quarter, all on stair access in rain.
Open RSK-016 →